MonZon Modular is manufactured from steel and combines the speed of frame scaffolding
with the flexibility of standard pipe and coupler scaffolds.
Use
This scaffolding package is suitable when material must be stored on the scaffold. Scaffolds with this width
are often used, for example, when windows shall be changed or facade work shall be executed.
Working area vs. Scaffold area
By Working area we mean the area which a person can reach while working from the scaffold. Because we
estimate that an average person can reach an additional two meters when standing on the top level,
the Working area is calculated as follows: scaffold length + height to the top deck + 2 meters.
By Scaffold area we mean the actual area of the scaffold when erected.
Weight
3 845 kg.
Period of validity
This offer is valid up until September 30th, 2011.
Download specification »
|
|
|